by GlassInspector | May 1, 2026 | Glass Inspector 4D, Glass Inspector Overall Bow, Glass Inspector Temper, Glass Inspector Temper Quality, GlassInspector, Smart Pointer
From our first step in May 2010 to today, the journey of Glass Inspector has been one of continuous innovation and commitment to excellence. What started with 2 analysis channels capable of detecting defects and our invetion and patent ” smart pointer ”...
by GlassInspector | Apr 24, 2026 | GlassInspector, Smart Pointer
The Canary Islands-based company Cristalería Díaz Molina (Gáldar, Las Palmas de Gran Canaria) continues its commitment to innovation and excellence in its production processes. It has recently incorporated a Glass Inspector into its double-glazed unit manufacturing...
by GlassInspector | Apr 11, 2026 | Glass Inspector 4D, Glass Inspector Overall Bow, Glass Inspector Temper, GlassInspector, Smart Pointer
Daily Loss=U×A×C×R×RF×ID×CL U = Units produced per day A = Average surface area per unit (m²) C = Production cost per m² (€) R = Rejection rate (%) RF = Replacement / rework cost factor ID = Financial impact of invoice payment delay CL = Estimated customer loss /...
by GlassInspector | Apr 5, 2026 | Glass Inspector 4D, Glass Inspector Overall Bow, GlassInspector, Smart Pointer
On modern double glazing lines, operators handle panels up to 3.3 x 10 meters, and even glass panes up to 3.3 ×18 meters. That’s 33 square meters of glass moving fast — where a single undetected defect can mean rejection, claims, or costly rework. For years, quality...
by GlassInspector | Mar 22, 2026 | Glass Inspector 4D, Glass Inspector Overall Bow, Glass Inspector Temper, GlassInspector, Smart Pointer
Glass Inspector is taking a major step forward in innovation by integrating Artificial Intelligence into its inspection process. This new AI-powered capability is designed to support line operators by automatically analyzing and evaluating every defect detected on the...
by GlassInspector | Mar 15, 2026 | Glass Inspector 4D, Glass Inspector Temper, GlassInspector
After completing the installation of the Glass Inspector Temper, we began a key phase of the project: training the team that will work with the technology daily. In this training session, we are sharing with the team how the system works, how to interpret the results,...