by GlassInspector | Apr 11, 2026 | Glass Inspector 4D, Glass Inspector Overall Bow, Glass Inspector Temper, GlassInspector, Smart Pointer
Daily Loss=U×A×C×R×RF×ID×CL U = Units produced per day A = Average surface area per unit (m²) C = Production cost per m² (€) R = Rejection rate (%) RF = Replacement / rework cost factor ID = Financial impact of invoice payment delay CL = Estimated customer loss /...
by GlassInspector | Apr 7, 2026 | Glass Inspector 4D, Glass Inspector Temper
In glass manufacturing and installation, precision is everything. One of the most critical — yet often overlooked — factors is planimetry control. Thanks to advanced tools like the Glass Inspector Temper, professionals can accurately assess the flatness of tempered...
by GlassInspector | Apr 5, 2026 | Glass Inspector 4D, Glass Inspector Overall Bow, GlassInspector, Smart Pointer
On modern double glazing lines, operators handle panels up to 3.3 x 10 meters, and even glass panes up to 3.3 ×18 meters. That’s 33 square meters of glass moving fast — where a single undetected defect can mean rejection, claims, or costly rework. For years, quality...
by GlassInspector | Mar 22, 2026 | Glass Inspector 4D, Glass Inspector Overall Bow, Glass Inspector Temper, GlassInspector, Smart Pointer
Glass Inspector is taking a major step forward in innovation by integrating Artificial Intelligence into its inspection process. This new AI-powered capability is designed to support line operators by automatically analyzing and evaluating every defect detected on the...
by GlassInspector | Mar 15, 2026 | Glass Inspector 4D, Glass Inspector Temper, GlassInspector
After completing the installation of the Glass Inspector Temper, we began a key phase of the project: training the team that will work with the technology daily. In this training session, we are sharing with the team how the system works, how to interpret the results,...